Underlit structure two days before event

Underlit structure two days before event

A practice run the evening before the first event day

A practice run the evening before the first event day

 

Lower portion of the landing starts to build with steel decking set onto pipes rolled to specific radii

Lower portion of the landing starts to build with steel decking set onto pipes rolled to specific radii

Base level to +12.5m starts to build on top of field cover

Base level to +12.5m starts to build on top of field cover

Day 3 - Evening

Day 3 - Evening

Landing slope nears completion

Landing slope nears completion

Day 5

Day 5

Silvertanium insulation installed directly onto steel decking with white Enka-drain laid over the top

Silvertanium insulation installed directly onto steel decking with white Enka-drain laid over the top

In-run - About half decked

In-run - About half decked

Looking down from Start Gate level

Looking down from Start Gate level

Slopes completed and covered and stair steps going in

Slopes completed and covered and stair steps going in

The unbelievable skill and perseverance of this team of guys & girls made this all happen - Best ever!

The unbelievable skill and perseverance of this team of guys & girls made this all happen - Best ever!

Structure completed and ready for banners & snow

Structure completed and ready for banners & snow

Banners rigged

Banners rigged

Snow being made on the landing. The first two of 52 tanker trucks

Snow being made on the landing. The first two of 52 tanker trucks

Snow being groomed one day before practice started

Snow being groomed one day before practice started

Showtime!

Showtime!